Period material summary

 

A report which shows the materials used in each month / week, in material code order

 

At the main screen:-

 

  Select: Review - Period / history analysis

  Select the required date range

  Select Period material summary from the Reports menu of the 'Report viewer'

 

The program displays the report on screen in the 'Report viewer'.

 

PAHR_Period_material_summary-01.png

 

The default data on the report is:-

 

Material code

Part Qty

Part length (sundry parts)

Part area (M2 or Ft2)

Part volume (M3 or Ft3)

Board Qty

Board area (M2 or Ft2)

Board volume (M3 or Ft3)

Cycles

Ptns

Time (hh:mm)

Cost

Av waste %

Sheets Qty

Sheet area (M2 or Ft2)

Sheet volume (M3 or Ft3)

Offcuts used Qty

Offcuts used area (M2 or Ft2)

Offcuts used volume (M3 or Ft3)

Av scrap %

Av offcut %

Av yield %

 

Report - options

 

There are menu options to set up the printer, page, report range, report content and layout. The report can be separately customised for both on-screen and printed versions. See the topic: Stock report layout and settings - Overview

 

reportsettings-icon.gif report settings (change report layout)

printlayout-icon.gif print layout (change layout for the printed report)

zoom-icon.gif expand on-screen view (4 levels of zoom)

printer-icon.gif print report (uses the settings from 'Print layout')

help-icon.gifinformation about the report contents and operation

doorexit-icon.gif exit without printing

 

File - Export  - export data

File - Modify range  - change items included in the report

 

navbuttons.gif Use the Navigation buttons to move between reports (or the Reports menu option).

 

See also