Action not available - cutting list already divided

 

Occurs when attempting to optimise a cutting list which has already been divided

 

For example, for a cutting list with Mixed materials.

 

Cutting list (EXAMPLE)

 

Description

Material

Length

Width

Qty

Over

Under

Grain

Edge

Gl

 

 

 

 

 

 

 

 

 

 

PART/302

CHIPBOARD-18MM

560.0

482.0

38

0

0

N

C000

 

PART/306

HARDBOARD-4MM

720.0

472.0

42

0

0

N

0000

 

PART/B4

CHIPBOARD-18MM

923.0

420.0

51

0

0

N

A000

 

PART/G12

HARDBOARD-4MM

809.0

420.0

32

0

0

N

0000

 

If the above list is Optimised and the system parameters are set to automatically divide the list, by material, and to use a separate cutting lists for each material the optimisation produces the following lists:-

 

EXAMPLE-CHIPBOARD-18MM

 

Description

Material

Length

Width

Qty

Over

Under

Grain

Edge

Gl

 

 

 

 

 

 

 

 

 

 

PART/302

CHIPBOARD-18MM

560.0

482.0

38

0

0

N

C000

 

PART/B4

CHIPBOARD-18MM

923.0

420.0

51

0

0

N

A000

 

EXAMPLE-HARDBOARD-4MM

 

Description

Material

Length

Width

Qty

Over

Under

Grain

Edge

Gl

 

 

 

 

 

 

 

 

 

 

PART/306

HARDBOARD-4MM

720.0

472.0

42

0

0

N

0000

 

PART/G12

HARDBOARD-4MM

809.0

420.0

32

0

0

N

0000

 

After optimisation if either of the new cutting lists is re-edited and re-optimised (for example, if a last minute change is required) this error occurs if the list is edited in a way which violates the divide settings (e.g. by having more than one material in a list - this error occurs.

 

EXAMPLE-HARDBOARD-4MM

 

Description

Material

Length

Width

Qty

Over

Under

Grain

Edge

Gl

 

 

 

 

 

 

 

 

 

 

PART/306

HARDBOARD-4MM

720.0

472.0

42

0

0

N

0000

 

PART/G12

HARDBOARD-6MM

809.0

420.0

32

0

0

N

0000

 

Check each list and correct any problems

Retry the optimisation

 

 

 

34010