Vertical boring - time per hole 

 

Machining centre parameter

 

 

Enter a time in seconds for each vertical bore.

 

This must be time per hole not a time per instruction as the instruction may include repeats.

 

This includes an allowance for the average horizontal head movement and for the down and back movement of the drill. e.g. 2.5 sec.

 

 

See also