Setup for Part costing

 

How to get ready for part costing

 

To use the full part costing make sure that the following are set.

 

- Information boxes for user-defined operations

 

The other items that need to be set are:-

 

- Machine rates parameters

- Part library (add times for user defined operations)

- Part drawings (machining)

- Machine centre parameters

- Edging library

- Edging parameters

- Saw parameters

 

At it's simplest part cost is the material cost of the part after optimisation so the part costing report can be produced without a full set up - so it is best to gradually investigate and add in the above items one at a time, as required, making sure that the costings are correct.

 

 

See also