How non-optimised parts are shown in Review runs
Where Sundry parts are included in a run (part list) the Review runs summaries include the sundry part details.
Management Summary - at the foot of the summary the total cost of each type of sundry item (item, linear, area) is shown.
Cost estimate Qty Rate Total cost
Sundry - linear 241.0 M 1.20 289.20
Sundry - area 10.42M2 6.25 65.10
--------
354.30
Part Summary - second summary page is included to show the costs of each sundry item
Board Summary - 'quantity used' column shows the number of parts (limit = 4), number of metres/feet (limit = 5) or the number square metres/feet (limit = 6)
Material Summary - number of boards column shows the number of parts (limit = 4), number of metres/feet (limit = 5) or the number square metres/feet (limit = 6).
Job costing summary - a separate section shows the sundry part costs.
Batch Summary - total sundry cost is displayed at the right