Sundry parts - summary reports

 

How non-optimised parts are shown in Review runs

 

Where Sundry parts are included in a run (part list) the Review runs summaries include the sundry part details.

 

Management Summary - at the foot of the summary the total cost of each type of sundry item (item, linear, area) is shown.

 

Cost estimate        Qty          Rate         Total cost

Sundry - linear     241.0 M       1.20           289.20

Sundry - area        10.42M2      6.25            65.10

                                               --------

                                                 354.30

 

Part Summary  - second summary page is included to show the costs of each sundry item

 

Board Summary - 'quantity used' column shows the number of parts (limit = 4), number of metres/feet (limit = 5) or the number square metres/feet (limit = 6)

 

Material Summary - number of boards column shows the number of parts (limit = 4), number of metres/feet (limit = 5) or the number square metres/feet (limit = 6).

 

Job costing summary - a separate section shows the sundry part costs.

 

Batch Summary - total sundry cost is displayed at the right

 