Use Project manager

 

Routing / Nesting system parameter to set how optimising works

mct2099-01.gif

 

When drawings for nested patterns are assembled, for display after optimising is complete, the program can either use it's own method or use the 'Project manager' software provided with the WoodWop program.

 

- Check the box to use the WoodWop Project manager.

 

tickbox9.gif Use Project manager

 

Not all WoodWop systems include 'Project manager' or the software may not be installed. In this case an error is reported before optimisation.

 

To use 'Project manager' check the box. Otherwise uncheck the box to use the 'Optimising program' method.

 

Where the 'Project manager' software is available is it best to use this.

 

 

Notes

 

- If MPR(X) based parts are used in the part list the System parameter: Use MPR(X) Based parts must also be set. This forces the program to automatically use 'Project manager' if it is available.

 

 

 

See also