Box for priority

 

Optimising parameter to set the part list information box to use to control the order in which parts are produced

 

 

The priority setting determines the order in which a part is produced. Parts with a higher priority are produced earlier in a set of cutting patterns than parts with a lower priority. Most importantly, higher priority parts are completed before lower priority parts. The priority is decided on the alphabetical order of the data in the box, for example, a '1' would be a higher priority than '2' and 'A' higher priority than 'B'.

 

Click on the box and select the box to use from the drop down list

 

The list of boxes are the Information boxes set. Typically an information box is set and used specifically for the priority value - but any box can be used. The value entered in the box at the part list, against each part, determines the priority in which the part is produced.

 

 

Notes

 

- To NOT use priority parts leave this parameter as None.

 

 

See also