The quantity of the part required for production (part or cutting list)
If a part is marked as a Plus part the optimiser uses the quantity as the maximum quantity for production. With a Plus part you may get any number from 0 to the maximum produced.
Use the Overs/Unders column to enter a tolerance on the production quantity.