Information on Parts produced for a run
At the Review runs screen:-
● Select: Summaries - Part summary
or
Select the Toolbar option
The report shows parts produced including any under or over production and the cost per part. If there is a mixture of materials the summary is sorted by material code.
The tabs at the foot of the report can be used for custom graphs and charts, for example, for variation in cycle time.
Use the Navigation buttons, Summaries menu or Stacked toolbar to browse the summaries. Many Review Runs options are also available on the top Toolbar
adjust on-screen column and
row width
zoom display in / out
print current report
exit
For full details of the on-screen options see help topic: Review runs screen
Notes
- Summary also includes any Information fields
- From stock is the amount of parts taken from stock
Total production = Qty required - From stock + (or -) overs and unders
Materials - the entries for each material are headed by a line showing Material code, description, thickness and max number of boards.
Sundry parts - if these are used details are included on a second page
Machine cost fields
Fields for machine costs are included on the Part summary and Sundry part summary. The costs are calculated from the times shown on the Machine times summary by applying the machine rate parameters.
- Saw cutting
- Machining
- Nesting
- Edging
- User defined fields
There is one field available on the report for each machine rate set (Parameters - Machine rate parameters).
The costs are totals for each part type produced and they include subtotal and grand total entries. Some of the fields require a particular module - costs are zero if the required module is not used.
See: Sundry parts summary